September w4 2024

September 27, 2024

Another hectic week this week! We developed a pre-deformation compensation step for our mesh processing, ensuring that printed geometry fits desired surfaces while under tension, added support for a print-in-place tagging system, developed a quality control and risk management plan for chainmesh, and strengthened the closures and the area immediately connecting to them. We got back a bunch of coupon tests and a compression stocking using the new ACVD and closure generation; we had great results in most areas, but found the closures to be too weak (hence the strengthening).